SOLAR STUDIO / FIELD TOOLS

PM Report Builder

← All tools Project details saved
SOLAR PV / PREVENTIVE MAINTENANCE

Project details

Start with the customer, site and solar system details.

✦New report? Start here3 simple steps
1 Choose or save a plant2 Complete site checks3 Preview & export PDF
★

Saved plants

Save project/system details once. Other report tabs start blank for every new visit.

Last completed PM dateNo completed visits recordedCalculated from saved PM visit history. Cannot be edited here.
Record a completed PM visit to calculate the next visit.
Completed PM visit history 0 visits

Use the maintenance start/end dates in “Client & visit”, then select “Record completed PM visit” to add a history entry.

Project details are saved in this browser. Test results, thermal notes, photos and conclusions start blank for every new visit. Export the PDF before refreshing or closing the page.
01

Client & visit

Information printed on the report cover and system data page.

02

PV system data

Core technical details from the existing report template.

03

Inverter · MPPT · string setup

Configure each inverter and its MPPTs once. Blank test rows will be prepared automatically for every new visit.

No inverter configuration saved yet.

Each MPPT can have its own number of strings. Setup changes save automatically for an existing plant; for a new plant, use “Save as new plant” above. Test readings are never saved.

Report header & company details Optional
◷

Next preventive maintenance visits

Showing only visits due this month and next month.

Reminders appear here when you open the app. They are stored on this browser; email or phone notifications are not enabled.

Sample plants are marked TEST and are for practice only.
▦

All saved sites

Full plant register, including overdue and future maintenance visits.

01

DC side string test results

One line per PV string. The report creates both DC test tables from these readings.

Addblank strings for inverter
Inv.MPPTStringVoc (V)Isc (A)+VE to E-VE to EPolarityIns. +Ins. -
Add strings to start recording test values.

Use OL for out-of-range insulation readings, or enter the measured resistance. Leave readings empty until tested.

01

AC grid voltage

Phase-to-neutral, phase-to-phase and neutral-earth readings.

Phase – Neutral (V)
Phase – Phase (V)
02

Earthing & protection checks

Record actual test outcomes; nothing is auto-marked compliant.

01

Thermal survey

Camera information and condition observations.

◉

Photos are entered in the next step. Thermal images will appear in the report under the same headings as the original annexure.

◉

Each equipment category has separate Before and After uploads. Photos are temporary for this visit; print or export the PDF before refreshing or closing the page.

01

Conclusions & recommendations

Add findings, actions and any items requiring follow-up.

02

Prepared by

Technician details for the final report page.

Your report is ready to review

Check the A4 layout, then print it or save it as a PDF.

Step 1 of 6
© 2026 Solar Studio. All rights reserved. · Created by Kasun Senarath