Project details
Start with the customer, site and solar system details.
Saved plants
Save project/system details once. Other report tabs start blank for every new visit.
Completed PM visit history 0 visits
Use the maintenance start/end dates in “Client & visit”, then select “Record completed PM visit” to add a history entry.
Client & visit
Information printed on the report cover and system data page.
PV system data
Core technical details from the existing report template.
Inverter · MPPT · string setup
Configure each inverter and its MPPTs once. Blank test rows will be prepared automatically for every new visit.
Each MPPT can have its own number of strings. Setup changes save automatically for an existing plant; for a new plant, use “Save as new plant” above. Test readings are never saved.
Report header & company details Optional
Next preventive maintenance visits
Showing only visits due this month and next month.
Reminders appear here when you open the app. They are stored on this browser; email or phone notifications are not enabled.
All saved sites
Full plant register, including overdue and future maintenance visits.
DC side string test results
One line per PV string. The report creates both DC test tables from these readings.
| Inv. | MPPT | String | Voc (V) | Isc (A) | +VE to E | -VE to E | Polarity | Ins. + | Ins. - |
|---|
Use OL for out-of-range insulation readings, or enter the measured resistance. Leave readings empty until tested.
AC grid voltage
Phase-to-neutral, phase-to-phase and neutral-earth readings.
Earthing & protection checks
Record actual test outcomes; nothing is auto-marked compliant.
Thermal survey
Camera information and condition observations.
Photos are entered in the next step. Thermal images will appear in the report under the same headings as the original annexure.
Each equipment category has separate Before and After uploads. Photos are temporary for this visit; print or export the PDF before refreshing or closing the page.
Conclusions & recommendations
Add findings, actions and any items requiring follow-up.
Prepared by
Technician details for the final report page.
Your report is ready to review
Check the A4 layout, then print it or save it as a PDF.